SHE Solutions, LLC

Safety, Health, and Environmental - Training, Audits, & Compliance
Ken Mushet, CSP, REM - President/ Principal Consultant
581 W. Locust Dr., Chandler, AZ 85248
Office (480) 883-7218 – Toll Free (866) 743-7658
www.shesolutions.com kmushet@shesolutions.com

 

 

Marine Mobile Fueling Page

If you conduct Marine Mobile Fueling Operations, the U.S. Coast Guard requires that you have an Operations Manual and Response Plan. 

SHE Solutions, LLC can help you quickly put together these documents for submission to the U.S.C.G. 

This package also includes the Letter of Intent required under 33 CFR 154.110 and three copies of each plan.  (Two for U.S.C.G. and one for your company.)

Investment:

The Operations Manual and Response Plan will be put together, with your specific operations input, and delivered to you for $ 2,950.

Marine Fueling Operations Manual Table of Contents

Section          Description                                                                                    

1.                     Geographic location

2.                     Physical description

3.                     Hours of operation

4.                     Size, type and number of vessels

5.                     Product information

6.                     Minimum number of personnel on duty during a transfer

and their duties

7.                     Names and numbers of who to call in an emergency

8.                     Duties of the Watchman for unmanned vessels

9.                     Description of each communication system

10.                   Location and facilities of each personnel shelter

11.                   Description and instructions for the use of drip and

discharge collection and vessel slop reception facilities

12.                   Description and the location of each emergency shutdown

system

13.                   Monitoring Devices

14.                   Quantity, type, location, and instructions for use, and time

limits for gaining access to containment equipment

15.                   Quantity, type, location, and instructions for use of fire

extinguishing equipment

16.                   Maximum allowable working pressure (MAWP) of each

loading arm, transfer pipe system, and hose assembly

17.                   Procedures

18.                   Procedures for reporting and initial containment of oil or

hazardous material discharges

19.                   A brief summary of applicable Federal, state, and local oil or

hazardous material pollution laws and regulations

20.                   Procedures for shielding portable lighting authorized by

the Captain of the Port

21.                   Description of the training and qualification program for

persons in charge:

22.                   Hazardous material transfer hose markings

23.                   Tank cleaning or stripping operations

Appendix A      Diagrams on the Trucks

Appendix B     Copies of the MSDS’s

Appendix C      Facility Booming Plan

33C.Marine Fueling Response Plan Contents

Section         Description   ____________________

 

1                      Introduction and Plan Contents

2                      Emergency Response Action Plan:

(i) Notification Procedures

(ii) Facility’s Spill Mitigation Procedures

(iii) Facility’s Response Activities

(iv) Fish and Wildlife and Sensitive Environments

(v) Disposal Plan

 

3                      Training: and Exercises

(i) Training Procedures

(ii) Exercise Procedures

 

4                      Plan Review and Update Procedures

 

5                      Appendices

(1) Facility-Specific Information

(2) List of Contacts

(3) Equipment List and Records

(4) Communications Plan

(5) Site-Specific Safety and Health Plan

(6) List of Acronyms and Definitions

*  The Operations Manual and Response Plan are for the company’s use only, not to be resold or bartered.  These plans may require an additional company investment in clean-up services, spill materials or oil booms, and the plans must be submitted to the U.S.C.G. for approval.

 

                                                            

Contact Information

Thank you for considering SHE Solutions, LLC.

SHE Solutions, LLC
Safety, Health, and Environmental - Training, Audits, & Compliance
Ken Mushet, CSP, REM - President/ Principal Consultant
Mailing Address:  581 W. Locust Dr. Chandler, AZ 85248
Office (480) 883-7218 - Fax (866) 744-5325
www.shesolutions.comkmushet@shesolutions.com

SHE Solutions, LLC  © 2003 - 2008